Cedar Shake & Shingle Siding Verification Checklist

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“11 Inspection Points
βœ“4 Verification Categories
βœ“Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Outside AND inside corner counts match the building's actual footprint, including any bump-outs, bay windows, or wing additions.
  • Overall wall height (corner board sizing only) reflects the tallest point a corner run must cover, e.g. full two-story height where applicable.
  • For an 18 in shake job, the actual bundle pack size (12/12 vs. 9/9) printed on the supplier's label was checked and matched to this calculator's Pack Size setting β€” a 9/9 pack covers only 75% of a 12/12 bundle's area at the same exposure. (24 in shakes have no CSSB-confirmed 9/9 equivalent; confirm your supplier's actual 24 in pack size separately.)
βœ“Coursing Method & Exposure+
  • Single vs. double coursing matches the actual installation plan β€” double coursing needs an independently calculated undercourse layer, not simply more of the face material.
  • Exposure entered does NOT exceed CSSB's own published maximum for the chosen length + coursing combination (this calculator caps it automatically, but confirm against your real product's data sheet too).
  • A doubled starter course (single coursing) or a TRIPLED starter course β€” two undercourse layers plus the face course (double coursing) β€” is planned at the wall base; the bottom course always needs one layer more than the rest of the wall.
  • For a double-coursed job, undercoursing shingles (NOT more of the face material, and NOT a flat copy of the face course's bundle count) are ordered as their own line item, calculated from the undercoursing shingle's own coverage math.
βœ“Corners, Trim & Fastening+
  • Fasteners are hot-dip galvanized, stainless, or another corrosion-resistant type rated for cedar's natural tannins β€” never electro-galvanized or plain steel, which will streak and corrode.
βœ“Installation & Final Check+
  • Joints between adjacent pieces are staggered course-to-course (never stacked in a straight vertical line) and keep the manufacturer's minimum spacing gap for wood movement.
Full QC Checklist+

Verify measurement, material/coursing selection, exposure, corners/trim, and installation before handover.

βœ“20 Inspection Points
βœ“4 Verification Categories
βœ“Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Outside AND inside corner counts match the building's actual footprint, including any bump-outs, bay windows, or wing additions.
  • Overall wall height (corner board sizing only) reflects the tallest point a corner run must cover, e.g. full two-story height where applicable.
  • Material (Shingle vs. Shake) and length (16/18/24 in) match the actual product being ordered β€” bundle coverage genuinely differs by both.
  • For an 18 in shake job, the actual bundle pack size (12/12 vs. 9/9) printed on the supplier's label was checked and matched to this calculator's Pack Size setting β€” a 9/9 pack covers only 75% of a 12/12 bundle's area at the same exposure. (24 in shakes have no CSSB-confirmed 9/9 equivalent; confirm your supplier's actual 24 in pack size separately.)
βœ“Coursing Method & Exposure+
  • Single vs. double coursing matches the actual installation plan β€” double coursing needs an independently calculated undercourse layer, not simply more of the face material.
  • Exposure entered does NOT exceed CSSB's own published maximum for the chosen length + coursing combination (this calculator caps it automatically, but confirm against your real product's data sheet too).
  • A doubled starter course (single coursing) or a TRIPLED starter course β€” two undercourse layers plus the face course (double coursing) β€” is planned at the wall base; the bottom course always needs one layer more than the rest of the wall.
  • For a double-coursed job, undercoursing shingles (NOT more of the face material, and NOT a flat copy of the face course's bundle count) are ordered as their own line item, calculated from the undercoursing shingle's own coverage math.
  • Waste allowance (5-15%) matches the job's actual complexity β€” more openings and cuts need a higher allowance.
βœ“Corners, Trim & Fastening+
  • Corner treatment (corner boards, woven/interlaced corners, or metal corners) matches what's actually being installed β€” this calculator always assumes corner boards.
  • Opening trim boards (casing) are planned around every window and door before shingles/shakes are cut in against them.
  • Fasteners are hot-dip galvanized, stainless, or another corrosion-resistant type rated for cedar's natural tannins β€” never electro-galvanized or plain steel, which will streak and corrode.
  • Exposed face-course pieces get 2 nails each; hidden undercourse and starter-course pieces get only 1 nail each β€” per CSSB's Sidewall Fastener Guidelines, not a flat 2-nails-everywhere rule.
  • Any piece wider than 10 in gets a 3rd nail, per CSSB β€” this calculator's nail estimate only tracks an average piece width and does not apply this rule automatically, so check actual wide pieces on site.
βœ“Installation & Final Check+
  • A breathable spacer/furring product (or at minimum, proper ventilation behind the cladding) is planned behind the shingles/shakes, per current best-practice rainscreen guidance for wood siding.
  • Finish choice (Natural weathering vs. Stained) matches what's actually planned β€” natural needs no field finish; stained needs the coverage rate confirmed against the real product's data sheet.
  • Joints between adjacent pieces are staggered course-to-course (never stacked in a straight vertical line) and keep the manufacturer's minimum spacing gap for wood movement.
  • Bundle, corner board, trim, nail, and stain quantities including the waste allowance β€” not the raw calculated totals β€” were used for the material order.
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.