TryBuildCalc

Cedar Shake & Shingle Siding Calculator (Bundles, Corners, Nails & Cost)

Calculate cedar shake/shingle bundles, corner boards, nails, and cost.

Inputs

Section 1: Building & Corners

ℹ️Used with Outside/Inside Corners to size corner board piece count — use the tallest point a corner run must cover, e.g. the full two-story height where applicable. Each wall section's own height (below) drives its own area.

ℹ️A simple rectangular house has 4 outside corners; add more for an L-shaped footprint, bay windows, or bump-outs.

ℹ️Both outside and inside corners use the same corner board convention here (two boards per corner, one per face) — unlike this category's Fiber Cement/Wood Siding calculators, which only board outside corners.

Section 2: Wall Sections

Wall Section 1

Windows on this wall

Doors on this wall

Windows and doors are fully cut out of the siding area on this wall — the leftover shingle/shake offcuts around an opening aren't reliably reusable elsewhere on the job.

Each row is a separate wall elevation — up to 20 sections, combined into one total. Leave window/door counts at 0 for a blank wall.

Section 3: Material, Length & Coursing

Material
▾

ℹ️Shingles come in 16/18/24 in lengths; Handsplit & Resawn shakes come in 18/24 in only — each length has its own CSSB-published reference coverage and maximum sidewall exposure.

Coursing Method

Single coursing is one layer per course, limited to a narrower exposure than double coursing for the same length. The bottom course gets one extra layer of the same face material (a doubled base course).

ℹ️CSSB's own published maximum for this length + coursing combination is 8 in. A wider exposure covers more wall per bundle but leaves less overlap.

Section 4: Finish

▾

ℹ️Left unfinished, cedar weathers on its own to a silvery-gray patina — the most common real-world choice for cedar sidewalls. Stained uses a disclosed coverage rate for rough-sawn cedar's higher absorbency.

Section 5: Waste Allowance

▾

ℹ️Applied to the siding area used for bundle coverage, opening trim boards, and stain gallons.

Section 6: Cost

Enable Cost Estimation?

Buy enough 18 in Cedar Shingles for single-course sidewall application

Covering 225.6 sq ft (21.0 m²) across 1 wall section(s).

Area & Bundles

Siding Area (openings fully deducted): 225.6 sq ft

Waste-Adjusted Area: 248.2 sq ft (10% waste)

Squares Needed: 1.71 squares (at 8.0 in exposure, max 8.0 in)

Face Course Bundles (18 in shingles): 7 bundle(s)

Starter Course Extra Layer (face-grade — doubles the base course): 1 bundle(s)

Total Bundles: 8 bundle(s) (4 bundles/square)

Corners, Trim, Nails & Finish

Corner Boards (outside + inside): 8 pc(s)

Opening Trim Boards: 4 pc(s) (54 ft)

Nails: 1,167 count (2 per exposed face piece, 1 per hidden undercourse/starter piece)

Bill of Materials

Main material: 7 bundle(s) (18 in shingles) + recommended tools

+

Computed items reflect your entered wall sections, material/length, and coursing method; consumables below are general recommendations — actual needs vary by product and site.

For Your Job

Face Course Bundles

7 bundle(s) (18 in shingles)

Find suppliers

Starter Course Extra Layer (face-grade)

1 bundle(s)

Find suppliers

Corner Boards & Trim

8 corner board pc(s) + 4 trim board pc(s)

Find suppliers

Nails

1,167 count

Find suppliers

General Tools & Consumables

Hot-dip galvanized or stainless siding nails

consumable

Breathable rainscreen spacer/furring strips

consumable

Weather-resistive barrier (house wrap)

consumable

Corner board stock or woven-corner shingles

consumable

Caulk, flashing tape, and masking film

consumable

Approximate results for planning only. Verify with a professional.

Cedar Shingle Single-Course Sidewall Layout

Doubled starter courseCorner boardCorner boardWindowDoor30 ft9 ft8 bundle(s), 1.7 squares total (all wall sections)Gray lines show each course at your chosen exposure; thin ticks show staggered random-width joints; simplified for clarity (not to scale, first wall section shown).

What Is a Cedar Shake & Shingle Siding Calculator?

If you're pricing a cedar shake or shingle sidewall job, this calculator answers how many bundles (face course, plus undercourse for double coursing, plus the doubled starter course for single coursing), corner boards, opening trim boards, nails, and stain you need from your own wall sections, window and door openings, material, length, coursing method, and exposure. It returns bundle counts per layer, accessory counts, and an optional material + labor cost.

It is built for homeowners, siding contractors, and estimators pricing a cedar shake or shingle sidewall job on a house with one or several distinct wall elevations, each with its own size and openings.

What this calculator covers — and what it doesn't:

This calculator covers CSSB-graded Certigrade-style sawn shingles (16/18/24 in) and Certi-Split Handsplit & Resawn shakes (18/24 in) in sidewall application, single or double coursed. It does NOT cover roof application (a genuinely different exposure/coverage table), fancy-butt/decorative-cut shingle patterns, or panelized shingle/shake siding systems — all out of scope for this build. If your project is smooth bevel lap or Board & Batten wood siding instead, use this site's Wood & Engineered Wood Siding Calculator instead.

The headline differentiator — real CSSB coverage math, not a flat bundle guess:

Bundle count is NOT a flat "4 bundles per square" guess — it scales linearly from the Cedar Shake & Shingle Bureau's own published reference exposure for your exact length (16/18/24 in shingles; 18/24 in shakes each have their own reference point), decoded directly from CSSB's current Wall and Roof Manual coverage tables. Double coursing is modeled as what it actually is — a hidden undercourse layer of actual undercoursing SHINGLES (per CSSB, calculated on its own independent coverage math, never just a copy of the face course's bundle count) — and every wall gets an extra bottom-course layer: single coursing gets a doubled base course, double coursing gets a tripled one, since double coursing's regular courses are already doubled and the bottom one needs one more.

Applicable standards:

  • Local building code (e.g. IBC/IRC fastening and weather-exposure requirements) governs which exposure and fastening schedule may be used, and always takes precedence over the general figures used here.
  • CSSB's own current Wall Manual and the specific product's own grade/packaging label should always be confirmed before finalizing a material order.
  • This calculator estimates material quantity and cost only, not structural wall design.

How the Cedar Shake & Shingle calculation works

Siding area (every window and door fully deducted) drives bundle coverage; bundle coverage itself scales linearly from CSSB's own published reference exposure for your chosen length.

Step 1 - Siding area and bundle coverage

Siding Area = SUM(Wall Width x Height) - SUM(Window Area + Door Area)

Waste-Adjusted Area = Siding Area x (1 + Waste %)

Coverage per Square = 100 sq ft x (Your Exposure / CSSB's Reference Exposure for this length)

Face Bundles = CEIL((Waste-Adjusted Area / Coverage per Square) x Bundles per Square)

Bundles per square is 4 for sawn shingles, 5 for hand-split & resawn shakes — CSSB's own packaging convention. Coverage per square scales linearly from CSSB's own published reference exposure (e.g. 18 in shingles: 5.5 in; 24 in shakes: 10 in), the exact shape CSSB's own coverage table extends out to sidewall's wider allowed exposures.

Step 2 - Double coursing and the starter course

Undercourse Bundles = bundlesFor(Waste-Adjusted Area, UNDERCOURSING SHINGLES' own coverage math) (Double Course ONLY)

Starter Course Bundles = bundlesFor(Total Base Width x (Exposure / 12)) — ALWAYS added, using undercourse-grade math for Double Course, face-grade math for Single Course

Total Bundles = Face Bundles + Undercourse Bundles + Starter Course Bundles

The hidden undercourse is calculated independently from CSSB's own undercoursing-SHINGLE coverage math (its own reference exposure, 4 bundles/square) at the same course spacing as the face layer — it is NEVER just a copy of the face course's bundle count, especially when facing with shakes, whose own coverage math genuinely differs. Every wall gets an extra bottom-course layer: single coursing gets a DOUBLED base course (one extra face-grade layer); double coursing gets a TRIPLED base course (one extra undercourse-grade layer on top of its already-doubled regular courses), per CSSB's own double-coursing instructions.

Step 3 - Corners, trim, and nails

Corner Board Pieces = (Outside Corners + Inside Corners) x CEIL(Overall Wall Height / 16 ft stock) x 2 faces

Trim Board Pieces = CEIL((Total Opening Perimeter x 1.1 waste factor x Waste Multiplier) / 16 ft stock)

Nails = CEIL(Exposed Pieces x 2 + Hidden Pieces x 1) — pieces backed into from area using an 8 in average piece width

Both outside AND inside corners use the same full-height corner board convention here (two boards per corner, one per face) — unlike this category's Fiber Cement/Wood Siding calculators, which only board outside corners. Nailing follows CSSB's own Sidewall Fastener Guidelines: 2 nails for every EXPOSED face-course piece, but only 1 nail for every HIDDEN undercourse/starter piece — not a flat 2 nails on every layer. CSSB also calls for a 3rd nail on any piece wider than 10 in, which this calculator's average-width model does not track (see Limitations).

Step 4 - Finish and cost

Stain Gallons = CEIL(Waste-Adjusted Area / 150 sq ft per gallon) — Stained finish only

Labor Cost = Waste-Adjusted Area x Labor Rate per sq ft

Natural (left to weather, no field finish) needs no stain at all — this calculator's default, since it's the most common real-world choice for cedar sidewalls. Stained uses a disclosed coverage rate reflecting rough-sawn cedar's much higher absorbency versus smooth painted lap siding elsewhere on this site.

Real-World Cedar Shake & Shingle Calculation Example

This example uses the active calculator inputs above and follows the same steps from the formula section.

Input Values Used

InputValueWhy it is used
Wall Sections1 section(s)Sums to the siding area that drives bundle coverage
Material & LengthSawn Shingle, 18 inSets the reference exposure and bundles-per-square ratio
Coursing & ExposureSingle course, 8 in (max 8 in)Drives bundle coverage and whether an undercourse/starter allowance applies
Waste Allowance10%Added to the siding area before computing bundle coverage

Step 1 — Siding Area & Face Bundles

CalculationFormula / SubstitutionResult
Gross area (all walls)SUM(width x height)270 sq ft
Siding area (every opening fully cut out)270 - 44226 sq ft
Waste-adjusted area226 x 1.1248 sq ft
Face course bundles1.71 squares x 4 bundles/square7 bundle(s)

Step 2 — Undercourse & Starter Course

CalculationFormula / SubstitutionResult
Starter course extra layer (face-grade — doubles the base course)bundlesFor(22 sq ft)1 bundle(s)
Total bundlesFace + undercourse + starter8 bundle(s)

Step 3 — Corners, Trim & Nails

CalculationFormula / SubstitutionResult
Corner board pieces(4 + 0) x 1 x 28 pc(s)
Trim board piecesCEIL(54 ft / 16 ft)4 pc(s)
NailsPieces x 21,167 count

Therefore, for this job you need 8 bundle(s) total, 8 corner board piece(s), 4 trim board piece(s), and 1,167 nails.

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

✓11 Inspection Points
✓4 Verification Categories
✓Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Outside AND inside corner counts match the building's actual footprint, including any bump-outs, bay windows, or wing additions.
  • Overall wall height (corner board sizing only) reflects the tallest point a corner run must cover, e.g. full two-story height where applicable.
  • For an 18 in shake job, the actual bundle pack size (12/12 vs. 9/9) printed on the supplier's label was checked and matched to this calculator's Pack Size setting — a 9/9 pack covers only 75% of a 12/12 bundle's area at the same exposure. (24 in shakes have no CSSB-confirmed 9/9 equivalent; confirm your supplier's actual 24 in pack size separately.)
✓Coursing Method & Exposure+
  • Single vs. double coursing matches the actual installation plan — double coursing needs an independently calculated undercourse layer, not simply more of the face material.
  • Exposure entered does NOT exceed CSSB's own published maximum for the chosen length + coursing combination (this calculator caps it automatically, but confirm against your real product's data sheet too).
  • A doubled starter course (single coursing) or a TRIPLED starter course — two undercourse layers plus the face course (double coursing) — is planned at the wall base; the bottom course always needs one layer more than the rest of the wall.
  • For a double-coursed job, undercoursing shingles (NOT more of the face material, and NOT a flat copy of the face course's bundle count) are ordered as their own line item, calculated from the undercoursing shingle's own coverage math.
✓Corners, Trim & Fastening+
  • Fasteners are hot-dip galvanized, stainless, or another corrosion-resistant type rated for cedar's natural tannins — never electro-galvanized or plain steel, which will streak and corrode.
✓Installation & Final Check+
  • Joints between adjacent pieces are staggered course-to-course (never stacked in a straight vertical line) and keep the manufacturer's minimum spacing gap for wood movement.
Full QC Checklist+

Verify measurement, material/coursing selection, exposure, corners/trim, and installation before handover.

✓20 Inspection Points
✓4 Verification Categories
✓Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Outside AND inside corner counts match the building's actual footprint, including any bump-outs, bay windows, or wing additions.
  • Overall wall height (corner board sizing only) reflects the tallest point a corner run must cover, e.g. full two-story height where applicable.
  • Material (Shingle vs. Shake) and length (16/18/24 in) match the actual product being ordered — bundle coverage genuinely differs by both.
  • For an 18 in shake job, the actual bundle pack size (12/12 vs. 9/9) printed on the supplier's label was checked and matched to this calculator's Pack Size setting — a 9/9 pack covers only 75% of a 12/12 bundle's area at the same exposure. (24 in shakes have no CSSB-confirmed 9/9 equivalent; confirm your supplier's actual 24 in pack size separately.)
✓Coursing Method & Exposure+
  • Single vs. double coursing matches the actual installation plan — double coursing needs an independently calculated undercourse layer, not simply more of the face material.
  • Exposure entered does NOT exceed CSSB's own published maximum for the chosen length + coursing combination (this calculator caps it automatically, but confirm against your real product's data sheet too).
  • A doubled starter course (single coursing) or a TRIPLED starter course — two undercourse layers plus the face course (double coursing) — is planned at the wall base; the bottom course always needs one layer more than the rest of the wall.
  • For a double-coursed job, undercoursing shingles (NOT more of the face material, and NOT a flat copy of the face course's bundle count) are ordered as their own line item, calculated from the undercoursing shingle's own coverage math.
  • Waste allowance (5-15%) matches the job's actual complexity — more openings and cuts need a higher allowance.
✓Corners, Trim & Fastening+
  • Corner treatment (corner boards, woven/interlaced corners, or metal corners) matches what's actually being installed — this calculator always assumes corner boards.
  • Opening trim boards (casing) are planned around every window and door before shingles/shakes are cut in against them.
  • Fasteners are hot-dip galvanized, stainless, or another corrosion-resistant type rated for cedar's natural tannins — never electro-galvanized or plain steel, which will streak and corrode.
  • Exposed face-course pieces get 2 nails each; hidden undercourse and starter-course pieces get only 1 nail each — per CSSB's Sidewall Fastener Guidelines, not a flat 2-nails-everywhere rule.
  • Any piece wider than 10 in gets a 3rd nail, per CSSB — this calculator's nail estimate only tracks an average piece width and does not apply this rule automatically, so check actual wide pieces on site.
✓Installation & Final Check+
  • A breathable spacer/furring product (or at minimum, proper ventilation behind the cladding) is planned behind the shingles/shakes, per current best-practice rainscreen guidance for wood siding.
  • Finish choice (Natural weathering vs. Stained) matches what's actually planned — natural needs no field finish; stained needs the coverage rate confirmed against the real product's data sheet.
  • Joints between adjacent pieces are staggered course-to-course (never stacked in a straight vertical line) and keep the manufacturer's minimum spacing gap for wood movement.
  • Bundle, corner board, trim, nail, and stain quantities including the waste allowance — not the raw calculated totals — were used for the material order.

Reference Tables

Maximum sidewall exposure (CSSB Wall Manual, No. 1 Grade)

MaterialLengthSingle Course MaxDouble Course MaxReference Exposure (100 sq ft/square)
Sawn Shingle16 in7 in12 in5 in
Sawn Shingle18 in8 in14 in5.5 in
Sawn Shingle24 in10.5 in16 in7.5 in
Handsplit & Resawn Shake18 in8 in14 in7.5 in
Handsplit & Resawn Shake24 in10.5 in18 in10 in

Figures are CSSB's own published Number 1 Grade sidewall figures — confirm against your specific product's grade/label before ordering.

Bundles per square

MaterialBundles per Square
Sawn Shingle4
Handsplit & Resawn Shake5

Waste allowance guide

Job ComplexityTypical Waste %
Simple rectangular walls, few openings5%
Typical residential job (default)10%
Many openings or complex cuts15%

Confirm material grade, exposure, fastening schedule, and corner treatment against the local building code and CSSB's current Wall Manual before finalizing an order — these figures are general planning guidance only.

How to Use the Cedar Shake & Shingle Calculator

  1. Enter the overall wall height and your building's outside and inside corner counts.
  2. Add one wall section per elevation with its width, height, and any window/door counts and average sizes.
  3. Choose Material (Sawn Shingle or Hand-Split Shake), Length, and Coursing Method (Single or Double Course).
  4. Set your exposure — this calculator caps it at CSSB's own published maximum for your chosen length + coursing combination.
  5. Choose a finish (Natural or Stained), and set a waste allowance.
  6. Add optional cost inputs for a full material + labor estimate.

Practical Cedar Shake & Shingle Tips

  • Stagger joints between courses — never let two pieces in adjacent courses share the same vertical joint line.
  • Leave CSSB's recommended gap between adjacent pieces in the same course (roughly 1/4-3/8 in) for natural wood movement — never butt them tight.
  • Use only hot-dip galvanized or stainless fasteners — cedar's natural tannins will streak and corrode plain or electro-galvanized steel.
  • Pre-sort bundles by width before starting a course, so wide and narrow pieces can be distributed evenly rather than clustered.
  • If staining, apply to all four sides/edges before installation where practical — factory-dipped or back-primed product reduces field labor significantly.
  • Order a doubled starter course row specifically for single coursing — don't assume the first regular-course bundle order already covers it.

Common Mistakes

  • Using a flat "4 bundles per square" assumption for shakes too — shakes are packaged 5 bundles to the square, not 4.
  • Exceeding CSSB's published maximum exposure for a given length/coursing combination to stretch material further, compromising weather-tightness.
  • Forgetting the doubled starter course on a single-coursed wall, or the TRIPLED starter course (two undercourse layers plus the face layer) on a double-coursed wall — the bottom course always needs one layer more than the rest of the wall.
  • Ordering undercoursing shingles by simply copying the face course's bundle count — undercoursing shingles have their own coverage math (4 bundles/square, their own reference exposure), genuinely different from a shake face course's own math (5 bundles/square).
  • Assuming every shake bundle is packed 12/12 — some suppliers pack 9/9 instead, which covers only 75% as much wall per bundle at the identical exposure, a real under-ordering risk if the pack size isn't confirmed.
  • Using plain or electro-galvanized nails instead of hot-dip galvanized or stainless, causing streaking and premature fastener failure.
  • Butting adjacent pieces tight in the same course with no gap, ignoring natural wood movement and risking buckling.

Cedar Shake & Shingle Calculator Limitations

  • This calculator covers CSSB-graded Certigrade-style sawn shingles and Certi-Split Handsplit & Resawn shakes in SIDEWALL application only — it does not cover roof application (a genuinely different coverage/exposure table), fancy-butt/decorative-cut patterns, or panelized shingle/shake siding systems.
  • This calculator always models corner boards at both outside AND inside corners — woven (interlaced) corners and metal corner flashings, both traditional alternatives some installers prefer for shingle/shake sidewalls, are not computed here.
  • Nail count is backed into from coverage area using a disclosed average 8 in piece-width assumption, since shingles/shakes are random-width and sold/counted by bundle — it is a planning estimate, not an exact count from your specific bundle's actual piece tally. CSSB's own rule for an additional 3rd nail on any piece wider than 10 in is NOT modeled, since this calculator only tracks an average width, not individual piece widths.
  • The undercourse always uses undercoursing-SHINGLE coverage math at the same course exposure as the face layer — this calculator does not let you choose a different, independent exposure for it, or model an alternative lower-cost single-undercourse-over-wood-lath starter detail.
  • CSSB's Undercoursing (No. 4) grade is only manufactured in 16 in and 18 in lengths — there is no genuine 24 in undercoursing product. For a 24 in job, this calculator undercourses with real 18 in undercoursing shingles instead of fabricating an unsupported 24 in figure.
  • The 12/12-vs-9/9 pack-size variance is only CSSB-documented for 18 in shakes. A 24 in shake job always assumes standard full-coverage (12/12-equivalent) packing here; confirm your supplier's actual 24 in pack size before ordering.
  • This calculator does not compute a breathable rainscreen/spacer product quantity, or a separate weather-resistive barrier takeoff — see this site's House Wrap Calculator for a dedicated WRB takeoff.
  • Only one standard grade tier (Number 1 Grade / Blue Label) is modeled for maximum exposure limits — a lower grade (e.g. Number 2 Red Label) may call for a narrower maximum exposure; confirm against your specific product's grade label.
  • Each wall section is modeled as a rectangle. A gable end or non-rectangular wall should be entered with an average height approximation, or measured separately.
  • This calculator estimates material quantity and cost only, not structural wall design.
  • Final exposure, fastening schedule, and corner/trim details should follow the local building code and CSSB's current Wall Manual.

Related Construction Calculators

You may also find these calculators useful for the same job:

Disclaimer: This calculator provides approximate results for planning and estimation purposes only. Actual requirements may vary based on site conditions, materials, workmanship, and local building regulations. Always consult a qualified engineer, architect, or construction professional before making final decisions.

FAQ

Shingles are sawn on both faces to a uniform taper (a smooth, machine-cut look), while shakes are split or resawn to show a thicker, more rustic, highly textured face — the Cedar Shake & Shingle Bureau (CSSB) certifies both as separate product lines with their own exposure and packaging rules. This calculator models both: Certigrade-style sawn shingles (16 in, 18 in, or 24 in) packed 4 bundles to the square, and Handsplit & Resawn shakes (18 in or 24 in) packed 5 bundles to the square — picking the wrong one for your actual product will under- or over-order material, since bundle coverage genuinely differs between them.
Single coursing is one layer of shingles/shakes per course, limited by CSSB to a fairly narrow maximum exposure (e.g. 7 in for 16 in shingles) to keep enough overlap for weather-tightness with only one layer backing up the weather side. Double coursing nails an inexpensive, hidden undercoursing-SHINGLE layer first, then a visible face layer directly over it at the SAME course spacing — because the undercourse backs up the face layer, CSSB allows a much wider exposure (e.g. 12 in for the same 16 in shingle), creating deeper shadow lines and often using fewer total courses. This calculator computes the undercourse on its own independent coverage math (the undercoursing shingle's own reference exposure and 4-bundles/square ratio) as a separate, usually cheaper line item — never by simply copying the face course's bundle count, which would be wrong whenever the face is a shake (shakes and shingles have genuinely different coverage math).