Solar Panel Size Verification Checklist
π Last updated: August 28, 2026
Essential Checklist+β
Complete these critical checks before approving the work or proceeding to the next construction stage.
β8 Inspection Points
β4 Verification Categories
βEnergy Usage Input Accuracy+-
- Actual average monthly usage confirmed from utility bills, not estimated
βPeak Sun Hours & Location Accuracy+-
- Peak sun hours sourced for your specific location, not a generic or national average
- Peak sun hours figure reflects an annual average, not a single best-case summer day
βSystem Sizing & Panel Selection+-
- Panel wattage matches the actual product being considered, not a placeholder value
βRoof, Installation & Code Compliance+-
- Actual usable, unobstructed roof area confirmed sufficient for the calculated panel count β not just the calculated area in the abstract
- Roof structural capacity for panel weight, wind load, and snow load confirmed by a qualified professional
- Local permitting, utility interconnection, and net-metering rules checked separately
- Licensed solar installer site assessment obtained before purchase or installation
Full QC Checklist+β
Verify energy usage input accuracy, peak sun hours/location accuracy, system sizing/panel selection, and roof/installation/code compliance.
β21 Inspection Points
β4 Verification Categories
βEnergy Usage Input Accuracy+-
- Actual average monthly usage confirmed from utility bills, not estimated
- A representative average month used, not an unusually high or low outlier month
- Reasonably foreseeable future loads (EV charger, pool, home addition) considered before finalizing the offset target
- Seasonal usage variation considered, not assumed flat across the year
- Usage figure confirmed to match the specific property/meter the system is being sized for
βPeak Sun Hours & Location Accuracy+-
- Peak sun hours sourced for your specific location, not a generic or national average
- Peak sun hours figure reflects an annual average, not a single best-case summer day
- Shading from trees, buildings, or other obstructions considered separately from the system efficiency factor
- Roof orientation and tilt confirmed reasonably close to optimal, or a lower efficiency factor used if not
- Local climate/weather pattern (persistent cloud cover, monsoon season, heavy haze) reflected in the peak sun hours figure used
βSystem Sizing & Panel Selection+-
- System efficiency/derate factor confirmed appropriate for your installation, not left at the generic default for an unusual setup
- Panel wattage matches the actual product being considered, not a placeholder value
- Panel efficiency used for the roof area calculation matches the actual panel technology's spec sheet
- Solar offset target genuinely matches your actual goal β full offset, partial offset, or oversized for future growth
- Understood that panel count rounds up to a whole number, so the actual array typically exceeds the bare minimum requirement
βRoof, Installation & Code Compliance+-
- Actual usable, unobstructed roof area confirmed sufficient for the calculated panel count β not just the calculated area in the abstract
- Roof structural capacity for panel weight, wind load, and snow load confirmed by a qualified professional
- Local permitting, utility interconnection, and net-metering rules checked separately
- Electrical integration (inverter capacity, service panel capacity) cross-checked separately
- Battery/backup storage, if desired, sized separately β not modeled by this calculator
- Licensed solar installer site assessment obtained before purchase or installation
Inspection Notes+-
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.
Inspection Notes
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.
Related Calculators & Guides
FAQ
Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.