TryBuildCalc

Aggregate Required for M20 Concrete (1:1.5:3 Concrete Aggregate Estimate)

Estimate aggregate required for M20 nominal concrete.

Inputs

Use this calculator when you know concrete volume and mix ratio. If you know the concrete element dimensions, switch to Dimensions mode and the calculator will first calculate concrete volume.

Need aggregate for road base, driveway, GSB, WMM, or area × depth? Use the Aggregate Coverage Calculator or Aggregate Weight Calculator.

Input Mode

ℹ️Selecting aggregate size updates the default ratio, aggregate part, and bulk density.

ℹ️For a 1:2:4 concrete ratio, the aggregate part is 4.

ℹ️Typical value is 1.54 for concrete and PCC aggregate estimation.

ℹ️Used to estimate weight from calculated loose aggregate volume.

Cost

Enable Cost Estimation?

For 1.000 of concrete at a 1:1.5:3 ratio, you need approximately 0.882 (31.2 cft) of 20mm aggregate — 1.37 tons.

Order Summary — Theoretical vs. Order Quantity

TheoreticalOrder Quantity
Volume0.8400.882 m³ (31.2 cft)
Weight1,302 kg1,367 kg (1.37 tons)

Theoretical = before wastage. Order Quantity = after your 5.0% wastage allowance. Round up to a supplier-friendly quantity — approx. 0.9 or 1.4 tons.

Volume & Mix Details

Wet volume: 1.000

Dry volume (×1.54): 1.540

Ratio used: 1:1.5:3, aggregate part 3

Assumptions Used

Aggregate size: 20mm | Bulk density: 1,550 kg/m³ | Actual weight varies by aggregate size, stone type, moisture, and compaction.

20mm Coarse Aggregate VisualizationConcrete Mix Ratio: 1 : 1.5 : 3Cement18%Sand27%Aggregate55%Recommended 20mm Aggregate QuantityMedium stone particles0.88231.15 cft | 1.367 tonsRound order: 0.9 m³ or 1.4 tonsDiagram simplified for clarity (not to scale)

Looking for the verification checklist, reference tables, tips, or common mistakes?See the complete Aggregate Calculator.

Aggregate for M20 nominal concrete

M20 nominal concrete is commonly estimated with a 1:1.5:3 ratio, where aggregate is the third (largest) part of the mix — this page preselects that ratio with the aggregate part set to 3.

Edit the volume above and the material breakdown and worked example update from the active values, still using the M20 mix ratio.

  • M20 (1:1.5:3) needs approximately 0.83-0.84 m³ of aggregate per cubic metre before wastage.
  • Aggregate part = 3, total parts = 5.5 for the M20 nominal ratio.
  • For structural work, confirm the final mix design against your project's approved specification.

Step-by-step aggregate quantity calculation method

Aggregate quantity calculation starts with the required wet concrete volume. In Direct Volume mode, you enter that concrete volume directly. In Dimensions mode, the calculator first converts length, width, and depth/thickness into concrete volume. The calculator then converts wet volume into dry material volume, applies the selected mix ratio, calculates the aggregate share, and converts loose aggregate volume into approximate weight using bulk density.

For road base, driveway layers, GSB, WMM, or area × depth aggregate-only work, use the Aggregate Coverage Calculator or Aggregate Weight Calculator. This calculator is for concrete mix-ratio aggregate estimation.

Step 1 - Determine required concrete volume

Concrete volume is the finished wet concrete volume required for slabs, beams, columns, PCC, foundations, or other construction works. Enter it directly, or calculate it from dimensions.

Direct Volume Mode: Wet Volume = Entered Concrete Volume

Dimensions Mode: Wet Volume = Length × Width × Depth / Thickness

Step 2 - Convert wet volume to dry volume

Dry volume factor accounts for voids between aggregate particles, sand bulking, compaction, and practical site handling losses. For concrete and PCC estimation, a dry volume factor of 1.54 is commonly used.

Dry Volume = Wet Volume × Dry Volume Factor

Step 3 - Calculate aggregate share from mix ratio

The aggregate ratio part is divided by the total mix ratio parts to calculate the loose aggregate volume required for the selected concrete mix.

Aggregate Volume = (Aggregate Part ÷ Total Parts) × Dry Volume

Step 4 - Convert aggregate volume to approximate weight

Bulk density converts loose aggregate volume into approximate aggregate weight. The default density changes automatically when you select 10mm, 20mm, or 40mm aggregate, and it can be adjusted for local material conditions.

Aggregate Weight = Aggregate Volume × Bulk Density

Step 5 - Apply wastage allowance

Wastage allowance accounts for practical site losses during transport, unloading, storage, handling, and placement.

Final Quantity = Base Quantity × (1 + Wastage %)

Worked Example

This example walks through your current inputs above, using the same steps as the Formula section.

Input Values Used

InputValueWhy it is used
Concrete volume1 m³Sets the wet concrete volume to convert
Mix ratio / aggregate part1:1.5:3, part 3, ×1.54Splits dry volume into the aggregate share
Density / wastage1,550 kg/m³, 5% wastageConverts volume to weight and adds a buffer for site losses

Step 1 — Volume

CalculationSubstitutionResult
Wet volume1 m³1.000
Dry volume1.000 × 1.541.540

Step 2 — Aggregate Quantity

CalculationSubstitutionResult
Aggregate volume (theoretical)3 / 5.5 × 1.5400.840
Aggregate weight (theoretical)0.840 × 1,5501,302 kg
With 5% wastage0.840 × 1.050.882 m³ (1.37 tons)

Therefore, plan for approximately 0.88 (31.2 cft) — 1.37 tons — of 20mm aggregate for this pour.

Disclaimer: This calculator provides approximate results for planning and estimation purposes only. Actual requirements may vary based on site conditions, materials, workmanship, and local building regulations. Always consult a qualified engineer, architect, or construction professional before making final decisions.

FAQ

Approximately 0.83-0.84 m³ of coarse aggregate per cubic metre of M20 (1:1.5:3) concrete, before wastage, using the standard 1.54 dry volume factor.
M20's nominal ratio (1:1.5:3) has different proportions than a general 1:2:4 mix — the aggregate share is 3/5.5 (54.5%) for M20 versus 4/7 (57%) for 1:2:4, a similar but not identical fraction.