House Wrap Verification Checklist

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“13 Inspection Points
βœ“4 Verification Categories
βœ“Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Roll size selected matches the actual product being purchased, not left at the default without checking the supplier's catalog.
βœ“Roll & Overlap Planning+
  • Horizontal (course-to-course) lap overlap matches the specific house wrap product's own installation instructions, not assumed from this calculator's default alone.
  • Roll count for ordering includes this calculator's waste allowance, not the raw unadjusted course length.
  • Starting course begins at the bottom of the wall so every subsequent course sheds water downward and outward over the one below.
βœ“Fasteners & Tape+
  • Fastener type (cap nails vs. cap staples) matches the product specified by the house wrap manufacturer for the substrate being fastened into.
  • Fastener spacing (both framing O.C. and vertical spacing) matches the manufacturer's published installation instructions for the wind exposure/zone, not assumed.
  • Seam tape is planned for every horizontal lap AND every vertical splice, not just the horizontal seams.
  • Flashing tape is planned at every window and door opening β€” head, both jambs, and sill β€” before the next course is installed over it.
βœ“Installation & Final Check+
  • No housewrap was installed over wet or unacceptably out-of-tolerance sheathing β€” the substrate was dry and sound before wrapping.
  • Every seam, splice, and flashing-taped opening was pressed/rolled firmly so the tape's adhesive fully engages, not just laid in place.
  • Any tears, punctures, or fastener mis-hits were patched with matching tape before the siding/furring was installed over them.
Full QC Checklist+

Verify measurement, roll/overlap planning, tape/fasteners, and installation before handover.

βœ“23 Inspection Points
βœ“4 Verification Categories
βœ“Measurement & Takeoff+
  • Every wall section's width and height were measured on site, not estimated from a floor plan alone.
  • Window and door counts and typical sizes were recorded for each wall section that has openings, not assumed uniform across the whole house.
  • Wall sections match the building's actual elevations, including any bump-outs, gables, or additions entered as their own rows.
  • A triangular gable end was entered with a reasonable average height, or its area was measured separately.
  • Roll size selected matches the actual product being purchased, not left at the default without checking the supplier's catalog.
  • Framing spacing and fastener vertical spacing match the actual stud layout and product instructions, not just this calculator's defaults.
βœ“Roll & Overlap Planning+
  • Horizontal (course-to-course) lap overlap matches the specific house wrap product's own installation instructions, not assumed from this calculator's default alone.
  • Vertical/end lap overlap at any splice joint is planned and communicated to the install crew β€” this calculator's splice and roll counts already account for it wherever a course needs splicing.
  • Roll count for ordering includes this calculator's waste allowance, not the raw unadjusted course length.
  • Starting course begins at the bottom of the wall so every subsequent course sheds water downward and outward over the one below.
  • Each wall's own course count and seam locations were checked against the actual roll width being purchased, not assumed from a different roll size.
βœ“Fasteners & Tape+
  • Fastener type (cap nails vs. cap staples) matches the product specified by the house wrap manufacturer for the substrate being fastened into.
  • Fastener spacing (both framing O.C. and vertical spacing) matches the manufacturer's published installation instructions for the wind exposure/zone, not assumed.
  • Seam tape is planned for every horizontal lap AND every vertical splice, not just the horizontal seams.
  • Flashing tape is planned at every window and door opening β€” head, both jambs, and sill β€” before the next course is installed over it.
  • Flashing tape sequence follows a shingle-style order (sill first, then jambs, then head) so water sheds outward at every layer.
  • Tape and fastener box/roll quantities including the waste allowance β€” not the raw calculated totals β€” were used for the material order.
βœ“Installation & Final Check+
  • No housewrap was installed over wet or unacceptably out-of-tolerance sheathing β€” the substrate was dry and sound before wrapping.
  • Every seam, splice, and flashing-taped opening was pressed/rolled firmly so the tape's adhesive fully engages, not just laid in place.
  • Manufacturer-specified exposure time limits (if any) for leaving the wrap exposed to UV/weather before siding installation were checked and scheduled around.
  • Any tears, punctures, or fastener mis-hits were patched with matching tape before the siding/furring was installed over them.
  • This calculator's planning-level estimate β€” not the as-built wrap β€” was reconciled against the actual material used, and the difference investigated if large.
  • Local building code's water-resistive barrier requirement (e.g. IRC R703.2) and the product's own installation instructions were both confirmed before final sign-off.
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.