TryBuildCalc

Evaporative Cooler Verification Checklist

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“10 Inspection Points
βœ“4 Verification Categories
βœ“Inputs & Sizing Method+
  • Room/zone area accurately measured, not guessed
  • Ceiling height entered accurately, not left at the 8 ft default for a taller space
  • Climate Humidity Level selected based on actual local weather data, not an optimistic guess
βœ“Humidity Suitability Screening+
  • Suitability screening result reviewed and understood as a preliminary, humidity-tier-based flag, not a definitive design determination
  • If flagged: a refrigerated AC/heat pump alternative seriously considered, after checking the location's actual design wet-bulb temperature, not just this RH tier
βœ“Airflow & Pad Sizing+
  • Required CFM checked against the actual unit's rated CFM specification before purchasing, not assumed to match exactly
βœ“Installation & Operation+
  • Relief/exhaust path confirmed available and sized at or above the Relief Vent Area result before operating the unit
  • Water supply line, float valve, and drain/bleed-off sized and connected per the unit manufacturer's installation instructions
  • Structural support for a roof-mounted unit confirmed adequate by a qualified installer before installation
  • Licensed HVAC/cooling contractor sign-off obtained before relying on this as a final design
Full QC Checklist+

Verify inputs/sizing method, humidity suitability screening, airflow and pad sizing, and installation/operation.

βœ“22 Inspection Points
βœ“4 Verification Categories
βœ“Inputs & Sizing Method+
  • Room/zone area accurately measured, not guessed
  • Ceiling height entered accurately, not left at the 8 ft default for a taller space
  • Air Exchange Rate selection matches actual local climate conditions, not left at Standard by default
  • Climate Humidity Level selected based on actual local weather data, not an optimistic guess
  • Cooling Pad Type matches the actual media being purchased, not just a default
βœ“Humidity Suitability Screening+
  • Suitability screening result reviewed and understood as a preliminary, humidity-tier-based flag, not a definitive design determination
  • If flagged: a refrigerated AC/heat pump alternative seriously considered, after checking the location's actual design wet-bulb temperature, not just this RH tier
  • If flagged Reduced Effectiveness: expectations set appropriately for a smaller comfort improvement than the CFM figure alone suggests
  • Local design wet-bulb temperature checked against a weather-data source for a more precise assessment beyond this simplified RH-tier screening, for a borderline or high-stakes installation
βœ“Airflow & Pad Sizing+
  • Required CFM checked against the actual unit's rated CFM specification before purchasing, not assumed to match exactly
  • Once a specific unit is selected, its rated CFM re-entered into the Actual Unit CFM field so pad area, relief vent, and water usage reflect the real unit, not just the bare calculated minimum
  • Pad Area checked against the specific unit's actual pad dimensions, not assumed to match this calculator's figure exactly
  • Multiple smaller units (or ducted distribution) considered for a large or oddly-shaped space instead of one oversized single unit
  • Water Usage range (not a single fixed number) used when sizing a reservoir, water line, or float valve
  • Elevation/altitude correction consulted separately (manufacturer spec or a qualified installer) for an installation above roughly 2,000-3,000 ft
βœ“Installation & Operation+
  • Relief/exhaust path confirmed available and sized at or above the Relief Vent Area result before operating the unit
  • Water supply line, float valve, and drain/bleed-off sized and connected per the unit manufacturer's installation instructions
  • Pad wetness and water distribution checked evenly across the full pad face after startup
  • Pad replacement/cleaning scheduled per the manufacturer's recommended interval, not left until performance visibly drops
  • Unit drained and winterized before freezing weather, in any climate where it applies
  • Structural support for a roof-mounted unit confirmed adequate by a qualified installer before installation
  • Licensed HVAC/cooling contractor sign-off obtained before relying on this as a final design
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.