Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“10 Inspection Points
βœ“4 Verification Categories
βœ“Inputs & Sizing Method+
  • Calculator mode (Boiler Size vs. Baseboard Length) matches the actual task
  • House area (Boiler mode) or room/zone area (Baseboard mode) accurately measured, not guessed
  • Correct IECC climate zone selected for the property's actual location
  • Baseboard mode: water temperature entered is the AVERAGE of supply and return (not the supply/aquastat setting alone), matching the actual or planned system design
βœ“Boiler Selection & Installation+
  • Net I=B=R output rating (not Gross/DOE Heating Capacity) matched directly against a specific boiler model's actual spec sheet
  • Combustion venting/chimney requirements confirmed for the selected AFUE tier (standard-efficiency atmospheric vs. condensing sidewall)
βœ“Baseboard / Distribution Installation+
  • Water temperature used for baseboard sizing is the actual AVERAGE (supply + return, divided by 2) the system will run at β€” not the supply/aquastat setting alone
βœ“Commissioning & Safety+
  • System purged of air and hydraulically balanced across all zones before considering the boiler commissioned
  • Pressure relief valve, low-water cutoff, and expansion tank precharge all verified functional at commissioning
  • Licensed HVAC/hydronic heating contractor sign-off obtained before relying on this as a final design
Full QC Checklist+

Verify inputs/sizing method, boiler selection and installation, baseboard/distribution installation, and commissioning/safety.

βœ“22 Inspection Points
βœ“4 Verification Categories
βœ“Inputs & Sizing Method+
  • Calculator mode (Boiler Size vs. Baseboard Length) matches the actual task
  • House area (Boiler mode) or room/zone area (Baseboard mode) accurately measured, not guessed
  • Correct IECC climate zone selected for the property's actual location
  • Insulation quality assessed honestly, not defaulted to Average without checking
  • Boiler mode: AFUE selection matches the specific boiler model actually being considered, not just the calculator's default
  • Baseboard mode: water temperature entered is the AVERAGE of supply and return (not the supply/aquastat setting alone), matching the actual or planned system design
βœ“Boiler Selection & Installation+
  • Net I=B=R output rating (not Gross/DOE Heating Capacity) matched directly against a specific boiler model's actual spec sheet
  • If the result flags "Exceeds Single Boiler": a licensed HVAC/hydronic contractor consulted rather than defaulting to the largest available single unit
  • Input BTU (nameplate) checked against the actual gas line/meter or oil tank/line supply capacity
  • Circulator pump sized to the shown GPM flow rate at the system's actual total head loss (not modeled by this calculator)
  • Combustion venting/chimney requirements confirmed for the selected AFUE tier (standard-efficiency atmospheric vs. condensing sidewall)
  • Near-boiler piping (primary/secondary loop, air separator, expansion tank, backflow preventer) follows the manufacturer's installation manual
βœ“Baseboard / Distribution Installation+
  • Water temperature used for baseboard sizing is the actual AVERAGE (supply + return, divided by 2) the system will run at β€” not the supply/aquastat setting alone
  • Single-zone baseboard run checked against the ~52 ft / 170 EDR guideline; split into multiple zone loops if the result flags it
  • Baseboard placement keeps furniture, drapery, and floor coverings clear of the manufacturer's stated clearance for convective airflow
  • Damper/enclosure installed and left open per the manufacturer's rating conditions
  • Piping to each individual zone sized for that zone's own required flow, not just the boiler's total combined output
βœ“Commissioning & Safety+
  • System purged of air and hydraulically balanced across all zones before considering the boiler commissioned
  • Pressure relief valve, low-water cutoff, and expansion tank precharge all verified functional at commissioning
  • Each zone's actual delivered temperature drop checked against the assumed design Ξ”T after commissioning
  • Licensed HVAC/hydronic heating contractor sign-off obtained before relying on this as a final design
  • Understood this is a square-footage planning estimate, not an ACCA Manual J load calculation or full hydronic engineering design
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.