Attic Ventilation Verification Checklist
π Last updated: September 12, 2026
Essential Checklist+β
Complete these critical checks before approving the work or proceeding to the next construction stage.
β10 Inspection Points
β4 Verification Categories
βAttic & Ratio Inputs+-
- Attic floor area confirmed as the actual attic space β not the home's conditioned/living square footage
- Climate zone confirmed against your actual location β determines whether a vapor retarder is even one of the 1:300 exception's conditions
- In Climate Zones 6-8: vapor retarder presence confirmed by actual attic inspection, not guessed
- Vent placement condition confirmed against the actual (or planned) layout β 40-50% of NFA within 3 ft of the ridge, balance in the bottom third of the attic
- Soffit vent NFA rating entered matches the actual chosen product's stamped rating, not the calculator's 9 sq in/ft default
βBefore Installation+-
- Confirmed intake NFA is at or above exhaust NFA β never let exhaust exceed intake
- Confirmed the attic is a standard vented assembly, not an unvented spray-foam-encapsulated ("hot roof") assembly
βInstallation+-
- Installed soffit vent linear footage matches or exceeds the calculated requirement, split appropriately across all eaves
- Installed ridge vent length (or gable/box vent count) matches the calculated requirement
βAfter Installation+-
- Visual inspection from inside the attic confirms visible daylight/airflow at both soffit and exhaust vent locations
Full QC Checklist+β
Verify attic/ratio inputs, pre-installation planning, installation, and post-installation verification for soffit and ridge/gable exhaust venting.
β22 Inspection Points
β4 Verification Categories
βAttic & Ratio Inputs+-
- Attic floor area confirmed as the actual attic space β not the home's conditioned/living square footage
- Climate zone confirmed against your actual location β determines whether a vapor retarder is even one of the 1:300 exception's conditions
- In Climate Zones 6-8: vapor retarder presence confirmed by actual attic inspection, not guessed
- Vent placement condition confirmed against the actual (or planned) layout β 40-50% of NFA within 3 ft of the ridge, balance in the bottom third of the attic
- Soffit vent NFA rating entered matches the actual chosen product's stamped rating, not the calculator's 9 sq in/ft default
- Exhaust vent type selection (ridge vs. gable/box/turbine) matches what's actually being installed
- Ridge/gable/box vent NFA rating entered matches the actual chosen product's stamped rating
βBefore Installation+-
- Confirmed intake NFA is at or above exhaust NFA β never let exhaust exceed intake
- Confirmed the attic is a standard vented assembly, not an unvented spray-foam-encapsulated ("hot roof") assembly
- Baffles (rafter vents) planned for every soffit bay before insulation is installed or re-blown
- Confirmed no conflicting exhaust types are planned together (e.g. ridge vent plus gable vents plus a powered attic fan)
- Local code amendments checked against the IRC R806.2 baseline this calculator uses
βInstallation+-
- Installed soffit vent linear footage matches or exceeds the calculated requirement, split appropriately across all eaves
- Installed ridge vent length (or gable/box vent count) matches the calculated requirement
- Baffles actually installed at every soffit bay before insulation contacts the vent opening
- Vent openings kept clear of paint overspray, construction debris, and overly fine insect screening
- If retrofitting into an existing attic: existing insulation checked and pulled back from soffit vents before new vents/baffles go in
βAfter Installation+-
- Visual inspection from inside the attic confirms visible daylight/airflow at both soffit and exhaust vent locations
- Attic temperature/humidity spot-checked on a hot day or after a rain event to confirm expected performance
- Vent screens confirmed intact with no signs of pest entry (birds, rodents, insects) through vent openings
- Installed vent products' NFA ratings and quantities documented for future reference
- Photos of completed venting (soffit, ridge/gable, baffles) kept for records and warranty purposes
Inspection Notes+-
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.
Inspection Notes
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.
Related Calculators & Guides
FAQ
Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.