Hip Roof / Hip & Valley Rafter Quantity Verification Checklist

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“8 Inspection Points
βœ“4 Verification Categories
βœ“Dimension & Pitch Inputs+
  • Building (or wing) width and length confirmed from actual field measurements or plans, not assumed
  • Roof pitch entered matches the actual design intent, and is the SAME on both roof planes
  • Rafter spacing matches the roof sheathing's span rating and the actual roof load for this project
  • Local building code edition, wind/seismic zone, and snow load confirmed before finalizing
βœ“Hip / Valley Geometry & Cuts+
  • Confirmed this calculator gives hip/valley rafter LENGTH and plumb-cut angle only, not compound side-cut/backing-bevel angles
βœ“Jack Rafter Layout+
  • Jack rafter length series (shortest to longest) verified against actual layout before cutting
βœ“Code, Safety & Sign-Off+
  • Birdsmouth notch depth checked against the commonly-required 1/4-of-depth limit for this rafter size
  • Any hip/valley beam carrying unusually long spans or heavy point loads reviewed by a structural engineer
Full QC Checklist+

Verify dimension/pitch inputs, hip/valley geometry and cuts, jack rafter layout, and code/safety sign-off.

βœ“21 Inspection Points
βœ“4 Verification Categories
βœ“Dimension & Pitch Inputs+
  • Building (or wing) width and length confirmed from actual field measurements or plans, not assumed
  • Roof pitch entered matches the actual design intent, and is the SAME on both roof planes
  • Correct roof section type selected (Hip Roof vs. Hip & Valley wing/addition)
  • Rafter spacing matches the roof sheathing's span rating and the actual roof load for this project
  • Local building code edition, wind/seismic zone, and snow load confirmed before finalizing
  • Same overhang entered applies correctly to both common AND hip/jack rafter tails for a continuous fascia line
βœ“Hip / Valley Geometry & Cuts+
  • Confirmed this calculator gives hip/valley rafter LENGTH and plumb-cut angle only, not compound side-cut/backing-bevel angles
  • Hip/valley rafter total length checked against available stock lengths before ordering
  • If width and length are equal (a pyramid hip), confirmed there is no ridge board and all 4 hips converge at a single apex
  • Structural support for the hip rafter's load path (down to a corner post/header) verified where needed
  • Hip/valley rafter lumber size confirmed adequate for its actual (longer) span, not just matched to the common rafter size
  • Common rafter count confirmed to include king common rafters, not just the in-line commons along the ridge
βœ“Jack Rafter Layout+
  • Jack rafter length series (shortest to longest) verified against actual layout before cutting
  • Jack rafter side-cut angle (where it meets the hip/valley) confirmed separately, not computed by this calculator
  • Jack rafter count and lengths confirmed to apply identically on both walls meeting each hip/valley corner
  • Jack rafters (like commons) installed crown-up, and checked individually before cutting the full series
βœ“Code, Safety & Sign-Off+
  • Birdsmouth notch depth checked against the commonly-required 1/4-of-depth limit for this rafter size
  • Any hip/valley beam carrying unusually long spans or heavy point loads reviewed by a structural engineer
  • Permit and framing inspection requirements confirmed before roof sheathing covers the rafters
  • Unequal pitches, irregular building shapes, or any non-standard condition reviewed by a designer or structural engineer
  • Total rafter count reconciled against the actual architectural roof plan before ordering lumber
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.