Trench Excavation Verification Checklist

Essential Checklist+

Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“18 Inspection Points
βœ“4 Verification Categories
βœ“Dimensions and Route+
  • Trench length was measured along the actual route on site β€” not scaled from a drawing.
  • Trench width is the excavation width β€” not the pipe or footing width. Add at least 300mm each side for installation working space.
  • Trench depth is measured from existing ground level to the bottom of the pipe bedding or foundation β€” including any granular bedding layer.
  • Changes in trench depth along the route (due to gradient or crossing services) were accounted for by splitting the trench into sections.
  • Dimensions were entered in consistent units.
  • The trench route was walked on site and crossed services marked before dimensions were finalised.
βœ“Services and Underground Hazards+
  • All existing underground services along the trench route were identified from utility drawings and marked on the ground.
  • Trial holes were dug by hand within 500mm of any marked service before mechanical excavation began.
  • Electrical supply to cables within the trench zone was isolated or the cable route was confirmed safe before digging.
  • Minimum clearance from existing services was maintained β€” 150mm from water pipes, 300mm from gas pipes, 500mm from HV cables.
βœ“Shoring and Safety+
  • Trenches deeper than 1.2m in loose, sandy, or water-bearing soil have shoring, trench boxes, or battered sides.
  • Side battering (slope) for unshored trenches in non-cohesive soil is at least 1:1 from the trench bottom edge.
  • Excavated spoil is placed at least 1.0m from the trench edge β€” nearer placement increases collapse risk.
  • Safe means of entry and exit (ladder or steps) are provided at intervals not exceeding 6m for trenches over 1.2m deep.
  • Open trenches across pedestrian or vehicle routes are covered with rated trench plates when not being worked.
βœ“Volume, Bedding, and Reinstatement+
  • A bulking factor of 20–30% was applied to the calculated trench volume for spoil haulage.
  • Pipe bedding volume (granular material below and around the pipe) was calculated separately and added to the order.
  • Imported granular backfill specification was confirmed β€” clean gravel or crusher dust, not site-won clay or organic soil.
Full QC Checklist+

Verify trench dimensions, utilities, support, bedding, disposal, and safety.

βœ“23 Inspection Points
βœ“4 Verification Categories
βœ“Dimensions and Route+
  • Trench length was measured along the actual route on site β€” not scaled from a drawing.
  • Trench width is the excavation width β€” not the pipe or footing width. Add at least 300mm each side for installation working space.
  • Trench depth is measured from existing ground level to the bottom of the pipe bedding or foundation β€” including any granular bedding layer.
  • Changes in trench depth along the route (due to gradient or crossing services) were accounted for by splitting the trench into sections.
  • Dimensions were entered in consistent units.
  • The trench route was walked on site and crossed services marked before dimensions were finalised.
βœ“Services and Underground Hazards+
  • All existing underground services along the trench route were identified from utility drawings and marked on the ground.
  • Trial holes were dug by hand within 500mm of any marked service before mechanical excavation began.
  • Electrical supply to cables within the trench zone was isolated or the cable route was confirmed safe before digging.
  • Gas, water, and telecom authorities were notified before trenching in public or shared access areas.
  • Minimum clearance from existing services was maintained β€” 150mm from water pipes, 300mm from gas pipes, 500mm from HV cables.
βœ“Shoring and Safety+
  • Trenches deeper than 1.2m in loose, sandy, or water-bearing soil have shoring, trench boxes, or battered sides.
  • Side battering (slope) for unshored trenches in non-cohesive soil is at least 1:1 from the trench bottom edge.
  • Excavated spoil is placed at least 1.0m from the trench edge β€” nearer placement increases collapse risk.
  • Safe means of entry and exit (ladder or steps) are provided at intervals not exceeding 6m for trenches over 1.2m deep.
  • Trench is inspected by a competent person at the start of each shift and after rain or vibration from nearby plant.
  • Open trenches across pedestrian or vehicle routes are covered with rated trench plates when not being worked.
βœ“Volume, Bedding, and Reinstatement+
  • A bulking factor of 20–30% was applied to the calculated trench volume for spoil haulage.
  • Pipe bedding volume (granular material below and around the pipe) was calculated separately and added to the order.
  • Reinstatement material volume was calculated as: trench volume βˆ’ pipe volume βˆ’ bedding volume.
  • Imported granular backfill specification was confirmed β€” clean gravel or crusher dust, not site-won clay or organic soil.
  • Reinstatement compaction requirements (layers, passes, equipment) were confirmed with the engineer or road authority.
  • Surface reinstatement (tarmac, paving, concrete) was specified and costed separately from the earthwork.
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.