βBefore You Order+-
- Dimensions were measured on site.
- Depth was confirmed against the intended application.
- Compaction is included for bases and set to 0% for drainage gravel.
- French drain gravel is single-size and open graded.
- Roof ballast has structural engineer approval.
- The final quantity with wastage is used for purchase.
Full QC Checklist+β
Use this checklist before ordering or accepting gravel to verify the gravel type, project geometry, layer depth, density, compaction, wastage, bag size, and delivery capacity.
βBefore You Order+-
- Gravel name matches the supplier's local terminology.
- Shape mode matches the project area.
- Dimensions were measured on site.
- Depth was confirmed against the intended application.
- Compaction is included for bases and set to 0% for drainage gravel.
- French drain gravel is single-size and open graded.
- Wastage covers edges, corners, and spreading loss.
- Delivery vehicle capacity was confirmed.
- Roof ballast has structural engineer approval.
- Currency and units match the supplier quotation.
- Delivery charges and taxes were confirmed separately.
- The final quantity with wastage is used for purchase.
Inspection Notes+-
Inspection Notes
Common Mistakes+-
Applying Compaction to Drainage Gravel
Open-graded drainage gravel relies on void space for water movement and normally uses no compaction allowance.
Ordering Finished Volume for a Compacted Base
Driveway and road-base layers need additional loose material before compaction. Use the specified compaction allowance.
Using the Wrong Shape or Layer Depth
Circular, triangular, and L-shaped areas require different geometry. Verify the selected shape and measure depth at representative locations.
Common Mistakes
Applying Compaction to Drainage Gravel
Open-graded drainage gravel relies on void space for water movement and normally uses no compaction allowance.
Ordering Finished Volume for a Compacted Base
Driveway and road-base layers need additional loose material before compaction. Use the specified compaction allowance.
Using the Wrong Shape or Layer Depth
Circular, triangular, and L-shaped areas require different geometry. Verify the selected shape and measure depth at representative locations.