Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“11 Inspection Points
βœ“5 Verification Categories
βœ“Measurement & Planning+
  • Length and height/width for every wall, roof/attic, and foundation plane were measured on site, not taken from a floor plan alone.
  • Dimensions were entered in consistent units β€” all feet or all meters, not mixed.
βœ“Product Selection+
  • Target R-value meets or exceeds the local energy code minimum for the climate zone and area type, not just a generic default.
  • Foam type matches the application β€” Polyiso is excluded from Foundation/Below-Grade for a reason (moisture absorption); XPS is the common choice there instead.
  • The specific product's own current technical data sheet (R-value per inch or per-thickness table, standard thicknesses, panel size) was checked against this calculator's figures before finalizing quantity.
βœ“Quantity & Purchasing+
  • Wastage allowance (typically 10-15%) was applied on top of the real packed panel total, not used to replace it.
  • The final panel count including wastage β€” not the raw packed count β€” was used for purchase.
βœ“Installation+
  • Substrate is clean, dry, and structurally sound before fastening or adhering panels β€” loose, wet, or damaged substrate compromises both fastener hold and the air-sealing detail.
  • Panels are installed with joints staggered row to row (and layer to layer, for a multi-layer job) rather than aligned in a continuous line.
  • Fastening pattern (spacing and fastener type β€” cap nails, screws, or adhesive per substrate) matches the manufacturer's install guide for the chosen thickness and substrate.
βœ“Safety & Final Check+
  • Foam type and thickness installed on site matches what was actually purchased and planned, not substituted without re-checking the R-value.
Full QC Checklist+

Verify measurement, foam type/thickness selection, quantity, installation, and safety before finishing or covering a rigid foam board installation.

βœ“20 Inspection Points
βœ“5 Verification Categories
βœ“Measurement & Planning+
  • Length and height/width for every wall, roof/attic, and foundation plane were measured on site, not taken from a floor plan alone.
  • Dimensions were entered in consistent units β€” all feet or all meters, not mixed.
  • Separate area rows were used for sections with genuinely different foam type, target R-value, or area type rather than averaging them into one row.
  • Openings (windows, doors, large vents) were accounted for by reducing the entered plane size or increasing wastage, since this calculator does not subtract specific opening cutouts.
βœ“Product Selection+
  • Target R-value meets or exceeds the local energy code minimum for the climate zone and area type, not just a generic default.
  • Foam type matches the application β€” Polyiso is excluded from Foundation/Below-Grade for a reason (moisture absorption); XPS is the common choice there instead.
  • The specific product's own current technical data sheet (R-value per inch or per-thickness table, standard thicknesses, panel size) was checked against this calculator's figures before finalizing quantity.
  • Where the resolved plan needs multiple stacked layers, joints are planned to be staggered between layers, not aligned.
βœ“Quantity & Purchasing+
  • Wastage allowance (typically 10-15%) was applied on top of the real packed panel total, not used to replace it.
  • The final panel count including wastage β€” not the raw packed count β€” was used for purchase.
  • Where multiple area types/foam types/thicknesses are used, each product's own panel count was purchased separately, not a single combined total.
  • Fastener count and seam-tape roll count (if taping is planned) were checked against the actual install spec for the chosen product, not assumed from this calculator's defaults alone.
βœ“Installation+
  • Substrate is clean, dry, and structurally sound before fastening or adhering panels β€” loose, wet, or damaged substrate compromises both fastener hold and the air-sealing detail.
  • Panels are installed with joints staggered row to row (and layer to layer, for a multi-layer job) rather than aligned in a continuous line.
  • Fastening pattern (spacing and fastener type β€” cap nails, screws, or adhesive per substrate) matches the manufacturer's install guide for the chosen thickness and substrate.
  • Seam joints are taped/sealed per the air-barrier detail plan, if one is specified for this assembly.
  • Any code-required thermal/ignition barrier or UV-protective finish is planned for foam left exposed in a living space or to direct sunlight.
βœ“Safety & Final Check+
  • Appropriate PPE (cut-resistant gloves, eye protection, dust mask when cutting) was used during panel cutting and handling.
  • Foam type and thickness installed on site matches what was actually purchased and planned, not substituted without re-checking the R-value.
  • Panels were kept dry and protected from UV exposure before and during installation, per the manufacturer's storage guidance.
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.