Complete these critical checks before approving the work or proceeding to the next construction stage.

βœ“7 Inspection Points
βœ“3 Verification Categories
βœ“Layout & Site Inputs+
  • Driveway dimensions (length/width, or each section's length/width for an L-shaped layout) confirmed from an actual field measurement or site plan, not assumed
  • Property line, easement, and any local setback requirement confirmed before finalizing the driveway footprint
  • Utility locate service called (811 or local equivalent) before any excavation for the driveway or its base
  • Positive drainage slope planned before finalizing grade (typically 1-2% minimum away from structures)
βœ“Subgrade Preparation & Geotextile Fabric+
  • Subgrade compacted and confirmed stable before placing any base material, not left loose or organic-laden
βœ“Base & Asphalt Lift Construction+
  • Aggregate base compacted in lifts (not dumped and left loose), typically to at least 95% of maximum dry density
  • Each asphalt lift compacted with a heavy roller WHILE STILL HOT, not left to cool before rolling
Full QC Checklist+

Verify layout/site inputs, subgrade preparation and geotextile fabric, base and asphalt lift construction, and tack coat/sealcoat/maintenance.

βœ“20 Inspection Points
βœ“4 Verification Categories
βœ“Layout & Site Inputs+
  • Driveway dimensions (length/width, or each section's length/width for an L-shaped layout) confirmed from an actual field measurement or site plan, not assumed
  • Property line, easement, and any local setback requirement confirmed before finalizing the driveway footprint
  • Utility locate service called (811 or local equivalent) before any excavation for the driveway or its base
  • Positive drainage slope planned before finalizing grade (typically 1-2% minimum away from structures)
  • Single-lift vs. two-lift construction choice confirmed against the driveway's expected vehicle load and desired service life
βœ“Subgrade Preparation & Geotextile Fabric+
  • Subgrade compacted and confirmed stable before placing any base material, not left loose or organic-laden
  • Geotextile fabric (if included) installed directly on the compacted subgrade, with seams overlapped per the manufacturer's spacing, not butted edge-to-edge
  • Local frost depth considered for base thickness in cold climates
  • Wet or soft spots in the subgrade over-excavated and undercut (with extra aggregate backfill) before fabric placement, not just compacted as-is
  • Aggregate base graded with the same crown/slope as the intended finished asphalt surface, not left flat and corrected only in the asphalt lift
βœ“Base & Asphalt Lift Construction+
  • Aggregate base compacted in lifts (not dumped and left loose), typically to at least 95% of maximum dry density
  • Each asphalt lift compacted with a heavy roller WHILE STILL HOT, not left to cool before rolling
  • Tack coat applied evenly across the binder course BEFORE the surface course is placed, for two-lift construction
  • Delivered asphalt confirmed as genuine hot-mix from the plant, not a cold-mix product substituted for the primary surface
  • Delivered asphalt temperature spot-checked against the mix producer's target range before dumping, not assumed correct from the truck ticket alone
βœ“Tack Coat, Sealcoat & Maintenance+
  • First sealcoat application scheduled for at least 6-12 months after paving, not applied to freshly-installed asphalt
  • Ongoing sealcoat reapplication planned every 2-3 years (or per the product's specific instructions), not treated as a one-time application
  • Unsupported asphalt edges (with no curb or edging) confirmed backed by compacted soil or gravel shoulder, not left overhanging
  • Periodic maintenance (crack sealing, pothole repair, sealcoating) planned for, not treated as a one-time installation
  • Vehicle traffic restricted for the full initial cure period recommended by the paving contractor, not resumed as soon as the surface looks firm
Inspection Notes+
Use the latest approved drawings, specifications, and site measurements.
Complete all critical checks before proceeding to the next work stage.
Record deviations and confirm rectification where required.

Related Calculators & Guides

FAQ

Use it after collecting the project inputs and again before approving or closing the relevant work stage.
No. It supports verification but does not replace approved drawings, specifications, codes, manufacturer requirements, or professional inspection.