TryBuildCalc

Mortar-Set Patio Calculator (Rigid Installation, on a Slab)

Size your mortar-set patio materials instantly.

Inputs

Installation Method

Mortar-Set mortars pavers/flagstone onto a concrete slab (new or existing) — no separate edge restraint or fabric needed.

Surface Material

Concrete Slab

ℹ️Mortaring onto an existing, sound concrete patio skips new slab material and cost entirely.

ℹ️4 in is standard for a residential patio slab; step up for heavier loads like a hot tub or very heavy furniture.

ℹ️Optional — confirm with a local contractor/engineer for anything beyond a straightforward residential slab.

Mortar Setting Bed

ℹ️1.25 in nominal is the commonly-cited standard mortar setting bed thickness.

Pavers

ℹ️Pedestrian-only thicknesses — no 80mm vehicular-rated tier, since a patio never carries vehicle loads.

ℹ️Running bond has the lowest cutting waste and works with any paver shape; herringbone and basket weave are designed for roughly 2:1 rectangular pavers.

Joint Fill

ℹ️Mortared joints run wider than sand-set joints.

Cost

Enable Cost Estimation?

Pavers Needed

908

4 x 8 in (Standard Brick), Running Bond (Stretcher) — lowest waste

New Slab Needed

2.489 yd³

4" thick, new pour

Patio Area

192

sq ft (17.84 m²) — 16 x 12 ft

Installation Method: Mortar-Set (Rigid, on a Slab)Surface: Concrete Pavers

Concrete Slab

4" thick, new pour

Theoretical volume: 2.37 cu yd

Order volume (incl. 5% waste): 2.489 cu yd

Mortar Setting Bed

1.25" nominal thickness

Order volume (incl. 10% waste): 22 cu ft

Bags needed: 37 (~80 lb each)

Pavers

4 x 8 in (Standard Brick)

Order area (incl. 5% waste): 201.6 sq ft

Pavers: 908

Joint Fill

Mortar / grout, 0.5" wide

Volume (incl. 10% waste): 7.79 cu ft

Bags needed: 13 (~80 lb each)

Approximate results for planning only. Verify with a professional.

Patio Layout (Top-Down View)16 ft x 12 ftPattern: Running Bond (Stretcher)Layer Cross-SectionSubgrade (compacted soil)New Concrete Slab (4 in)Mortar Bed (1.3 in)Pavers (2.4 in)16 x 12 ft patio — Mortar-Set, Concrete PaversMortar-Set: no separate edge restraint needed

Diagram simplified for clarity (not to scale) — layer band heights reflect relative thickness, not exact scale.

Looking for the verification checklist, reference tables, tips, or common mistakes?See the complete Patio/Paver Materials Calculator.

Mortar-Set: a rigid system built on a concrete slab

Mortar-Set (rigid) installation mortars pavers or flagstone directly onto a concrete slab — either a newly poured slab or an existing, sound concrete patio — with a troweled mortar setting bed and mortared/grouted joints instead of loose joint sand. Because the slab itself contains the assembly at its edges, no separate edge restraint or geotextile fabric is needed.

This page defaults to a 16 x 12 ft patio (192 sq ft) with a new 4 in concrete slab — CMHA's own cited standard thickness for a residential patio slab. Edit the inputs above, including switching to 'Mortar Onto an Existing Concrete Patio/Slab' if you already have a sound slab to build on.

Patio/Paver Materials Calculator Formula: How Is It Determined?

Your patio area, installation method, and surface material combine into a full material takeoff, with a different formula path for each branch of the sand-set/mortar-set x pavers/flagstone matrix.

Step 1 — Patio Area

Area = Length x Width

Entered directly as a single rectangle.

Step 2a — Sand-Set: Base Course

Base Volume = Area x Base Depth

Order Volume = Base Volume x (1 + 15% compaction) x (1 + 8% waste)

Base depth is a pedestrian-only figure (4-6 in) per ICPI/CMHA patio guidance — materially shallower than a driveway's vehicular-load base.

Step 2b — Mortar-Set: Concrete Slab

Slab Volume = Area x Slab Thickness (skipped entirely if mortaring onto an EXISTING slab)

Order Volume = Slab Volume x (1 + 5% waste)

A new slab is 4-6 in thick per CMHA mortar-set guidance; an existing, sound concrete patio can be used directly with no new slab material.

Step 3 — Bedding Course or Mortar Setting Bed

Sand-Set: Bedding Volume = Area x Bedding Depth x (1 + 10% waste)

Mortar-Set: Mortar Bed Volume = Area x Mortar Bed Depth x (1 + 10% waste), then Bags = Order Volume / Bag Yield

Bedding sand/stone dust is installed loose (no compaction allowance); a mortar bed is troweled to a nominal thickness and bagged in whole units.

Step 4a — Concrete Pavers

Order Area = Area x (1 + Layout Pattern Waste %)

Paver Count = Order Area / Paver Unit Area

Layout pattern waste ranges 5-13% depending on cut geometry — the same formula this site's Paver Driveway Calculator uses, since the underlying cutting-waste geometry doesn't change for pedestrian loads.

Step 4b — Natural Flagstone

Order Area = Area x (1 + 10% cutting/breakage waste)

Tons = Order Area x Thickness x Stone Density / 2000

Flagstone is quantified by WEIGHT, not a fabricated per-unit count — coverage-per-ton is derived directly from the stone's own density and thickness.

Step 5 — Joint Fill

Rectangular units: Volume per sq ft = 144 x (1/W + 1/L) x Joint Width x Joint Depth

Flagstone: Volume = Area x Joint Area Fraction x Joint Depth

Concrete pavers use exact rectangular joint geometry; flagstone's irregular joints are approximated as a fraction of surface area that scales with joint width (a standard simplification for irregular-stone jointing takeoffs).

Step 6 — Cost

Line Cost = Order Quantity (bags/tons/sheets/bars/sq ft, as actually purchased) x Unit Price

Total = Sum of every line item relevant to your selected installation method

Every cost line is priced off the actual PURCHASED unit — never the bare theoretical volume — and only line items relevant to your selected Sand-Set/Mortar-Set branch are included in the total.

Worked Example

This example walks through your current inputs above, using the same steps as the Formula section.

Input Values Used

InputValue
Patio Size16 x 12 ft (192 sq ft)
Installation MethodMortar-Set
Surface Material4 x 8 in (Standard Brick), Running Bond (Stretcher) — lowest waste

Step 2b — Concrete Slab

CalculationResult
192 sq ft x 4/12 ft, +5% waste2.489 cu yd

Step 3 — Mortar Setting Bed

CalculationResult
192 sq ft x 1.25/12 ft, +10% waste22 cu ft (37 bags)

Step 4a — Pavers

CalculationResult
201.6 sq ft / 0.2222 sq ft per paver908 pavers

Step 5 — Joint Fill

CalculationResult
7.08 cu ft, +10% waste7.79 cu ft (13 bags)

Figures above are rounded for display; the real quantities are always calculated from full, unrounded values.

Therefore, a 192 sq ft (16 x 12 ft) Mortar-Set patio using 908 4 x 8 in (Standard Brick) pavers needs 2.489 cu yd of new slab concrete and 37 bags of mortar bed mix, plus 13 bags of joint fill.

FAQ

Yes — select 'Mortar Onto an Existing Concrete Patio/Slab' under Slab Source, and this calculator skips new slab material and cost entirely, computing only the mortar setting bed, pavers/flagstone, and mortared joints needed. Confirm the existing slab is sound (no major cracks or delamination) first.
CMHA and masonry-trade guidance commonly cites a nominal 1-1/4 in mortar bed thickness, with a practical range of roughly 3/4-1.5 in for an unbonded system — this calculator offers 1, 1.25 (the nominal default), and 1.5 in options.